Roofing Cost in West Allis, WI
Updated for 2025 • Climate Zone 6A (Cold-Humid) • Labor rates 2% below national average
Low Estimate
$4
per sq ft
Average Cost
$7
per sq ft
High Estimate
$12
per sq ft
West Allis labor costs are 2% below the national average
Roofing in West Allis: What You Need to Know
West Allis falls in Climate Zone 6A (Cold-Humid), which extreme winter conditions demand premium materials and installation. Understanding these local factors helps you make better decisions about materials and timing.
Ice Dams
High ice dam risk. Proper ventilation, insulation, and ice shield critical.
Heavy Snow
Snow loads can exceed 50 psf. Roof structure must be designed for loads.
Long Winters
6+ months of cold. Quality materials last longer through repeated stress.
✓ Recommended for West Allis
- • Architectural Shingles
- • Metal Standing Seam
- • Slate
✗ Not Recommended
- • Flat Roofs
- • Low-Quality Shingles
- • Tile (freeze-thaw)
Best time for this project in West Allis: May - September
Cold extends shingle life; proper installation prevents ice dam damage
Calculate Your Roofing Cost in West Allis
Estimate Your Roofing Cost
Your Estimated Cost
Low
$5,488
Average
$9,604
High
$16,464
Near national average
Budget-friendly option
Estimates are for planning purposes. Actual costs vary by project specifics, contractor, and market conditions.
How We Calculate West Allis Prices
- • Base national average: $7/sq ft
- • West Allis labor index: 0.98x (2% below national)
- • Adjusted base: $7/sq ft
- • + Material selection multiplier
Best Roofing Options for West Allis's Climate
Asphalt 3-Tab
Standard option
$5/sq ft
Architectural Shingles✓ Recommended
Good choice for Cold-Humid climate
$7/sq ft
Metal Standing Seam✓ Recommended
Good choice for Cold-Humid climate
$15/sq ft
Metal Corrugated✓ Recommended
Good choice for Cold-Humid climate
$13/sq ft
Clay Tile✗ Not Recommended
Not ideal for West Allis's conditions
$20/sq ft
Roofing FAQs for West Allis Homeowners
In West Allis's Climate Zone 6A, the best time for roofing projects is May - September. This timing helps ensure optimal conditions for installation and material performance.